| Department | Civil Engineering |
| Year | 2019-20 |
| Budget | 38000 |
| Students | Shrirang Y. Patel, Parth B. Chaudhary, Sachin M. Chaudhary, Fenil P. Patel , Urvashi K. Bhoraniya |
| Mentor | Prof. S. A. Trivedi |
| Abstract | The shoring framework proposed here will be workable easy and very foldable and highly adjustable . It can be easily be installed on site with minimum efforts . and the shoring frame work will be easy to remove also . The Shoring work is very important requirement of the construction procedure. When there is deep soil and soil becomes wet or having much moisture there is always a risk of fall of soils creating accidents. To minimize such accidents it is required to have proper shoring work done on construction site. For this purpose the awareness among the builders , contractors is required to be made . For such awareness , easy economic and workable shoring framework is an solution for this problem . |